Project Categories

District Cooling

Centralized Energy Supply to create Environment Friendly.

  • District Cooling System

A District Cooling System (DCS) distributes chilled water from a central plant to building individually through a network of underground pipes to use in space and process cooling. The thermal rejection is usually provided from the central plant, for eliminating the need of separated systems in the individual buildings. It is suitable for buildings i.e. offices, shopping centers, hotels, and residents, however, it is also suitable for densely area where demand cooling.

We can design, supply, install and start up systems of the new chiller plant or improve the existing chiller plant followed customer’s need. Our design and procurement have high efficiency, availability and reliability which are also easy for maintainability.

  • Electric Chiller

Electric chiller uses as downstream chiller. It driven by electricity utilizes the vapor-compression refrigeration cycle to produce cooling power operating on the heat pump principle. Coefficient of Performance (COP) of electric chiller is higher than absorption chiller.

  • Steam Absorption Chiller

Steam absorption chiller is driven by a heat source. This heat is usually delivered to the chiller via steam. Compare to electric chiller, absorption chiller consume electricity lower than.

All of projects, Thai Shinryo have completed with customer satisfactions for achieving project purposes. For our first project having total cooling capacity with 8,400 RT in the project of “CHILLER PLANT FOR TG CATERING FACILITIES – SBIA”, it was complete installed and in operation since September 2006. And our present project “ONE BANGKOK DISTRICT COOLING PLANT” having cooling capacity of 20,000 RT for the Initial Phase, it will be completed and ready to supply chilled water via utility tunnel network by January 2023.

Experienced Projects

One Bangkok_Combine System CUP Building (3)

A District Cooling Plant (Initial Phase) of One Bangkok

One Bangkok Mixed Use Development Project

Read More >>

A District Cooling Plant (Initial Phase) of One Bangkok

One Bangkok Mixed Use Development Project located in Prime CBD at the northeast corner of the intersection of Wireless, Rama IV, and Sathorn Road, Bangkok.

Project Description:

The District Cooling Plant will generate and supply chilled water to the end-user through a district cooling ring network. This 20,000RT plant capacity project is an Initial Phase of total 40,000RT after fully developed.  

Scope of Work:

EPCC Work for DCS Plant (Initial Phase Cap. 20,000 RT + TES 10,710 RTH)

Construction Period:

January 2021 to January 2023

dp2-1t

Chiller Plant Extension for SBIA

This Project located at Suvarnabhumi International Airport, Samutprakarn Province

Read More >>

Chiller Plant Extension for SBIA

This Project located at Suvarnabhumi International Airport, Samutprakarn Province

Project Description

The Plant is Steam Absorption Chiller System, including Mechanical Ventilation AC, Plumbing, Fire Protection, Electrical System and Civil Work

Configuration

Gas Turbine Generator

22.0 MW x 2 units

Heat Recovery Stream Generator

42.5 t/h x 2 units

Steam Turbine Generator

12.0 MW x 1 unit

Auxiliary Gas Boiler

18 t/h x 2 units and 20 t/h x 2 units

Steam Absorption Chiller for PTC

2,100 RT x 8 units (stage 1)
2,310 RT x 2 units (stage 2)

Steam Absorption Chiller for TG Catering

1,970 RT x 2 units + 1,500 RT x 3 units

Project Owner : District Cooling System and Power Plant Co., Ltd. (DCAP)
Construction Period : June 2005 – September 2006

1st Floor (13)

CHPP Plant Modification Project (Contract 2)

EPCC Works, including demolish work and improvement...

Read More >>

CHPP Plant Modification Project (Contract 2)

Scale of project :    

  • Absorption Chiller 1,600 RT x 2 units (supplied by Owner)
  • Electric Chiller 2,000 RT x 1 unit 
  • Electric Chiller 1,000 RT x 1 unit

Scope of work : EPCC Works, including demolish work and improvement the existing equipment.

Usage : Power Plant and Chiller Plant at The New Government Complex, Bangkok.

Construction period : August 2016 to August 2017

dp1-t

Helper Cooling Tower for PTC Chiller Plant Project

This Project located at Suvarnabhumi International Airport, Samutprakarn Province

Read More >>

Helper Cooling Tower for PTC Chiller Plant Project

This Project located at Suvarnabhumi International Airport, Samutprakarn Province

Project Description

The Project is Engineering, Procurement and Construction for Cooling Tower 2 units, to increase chilled water capacity to accommodate the increasing air conditioning load of PTC Chiller Plant.

Project Owner : District Cooling System and Power Plant Co., Ltd. (DCAP)
Construction Period : August 2010 – March 2011